ESME (Ecosystem Services Map Explorer): Haugh Head Ford River Restoration Project
Visit Tool
The Haugh Head Ford project utilised the Environment Agency’s Ecosystem Service Map Explorer (ESME) to incorporate natural capital evidence into the appraisal of a river restoration project in Northumbria. The Environment Agency’s Project and Programme Delivery team was evaluating the removal of a footbridge, ford and weirs at Haugh Head, alongside regrading approximately 400 metres of riverbed, installing an extended inset floodplain and reinstating the gravel ford. Several options had previously been assessed and rejected because of insufficient wider benefits and funding constraints, prompting the Environment Agency Natural Capital team to assess the project through a natural capital lens. The ESME assessment was undertaken to better identify and demonstrate the wider environmental benefits of the proposed intervention and provide stronger evidence for project appraisal. In particular, the case study explored whether changes to the project design could increase ecosystem service provision and improve natural capital outcomes beyond those already identified through conventional project assessment.
Tool Application
ESME was used alongside the Environment Agency’s Asset Service Matrix (ASM) and Natural Capital Data Discovery Tool (NCDDT) to establish a desk-based natural capital baseline for the project area. The ASM provided information on natural capital assets, while ESME assessed the existing capacity of the river to provide ecosystem services at river water bodies and river reach scales. These outputs were combined with NCDDT evidence on environmental conditions, pressures, and risks. Then, the combined evidence was incorporated into an Appraisal Summary Table (AST) and used to forecast the significance of changes in ecosystem service provision resulting from the proposed intervention. ESME helped identify potential benefits relating to habitat provision, erosion control, water flow, and water quality. The natural capital evidence enabled the Natural Capital and Project and Programme Delivery teams to explore how the project design could be modified to generate additional benefits, including further riverbank regrading, creation of more natural bankside habitat, riparian tree planting and increased floodplain reconnection upstream of Haugh Head Ford.
Case Study Outcomes
The ESME assessment provided stronger evidence of the wider ecosystem service benefits associated with the Haugh Head Ford project and directly informed discussions about potential changes to the project proposal. In particular, the analysis identified opportunities to increase habitat improvements and reconnect more of the upstream floodplain, with the potential to improve natural capital outcomes while reducing long-term risk to the ford.
ESME also identified potential additional benefits from further riverbank regrading, establishing more natural bankside habitat and undertaking riparian tree planting. These measures could enhance habitat provision, erosion control, water-flow regulation, and water quality, demonstrating how natural capital evidence can broaden an infrastructure appraisal beyond its immediate objectives.

The Environment Agency identified increased confidence in natural capital decision-making and evidence better suited to project needs. The case study therefore demonstrates how ESME can be integrated with other natural capital tools to establish an ecosystem service baseline, identify wider benefits, and inform project design. However, the case study records these additional interventions as potential changes considered during the appraisal process but does not confirm that they were approved or implemented in the Haugh Head Ford project.
Useful Links
Find more information about the case study above using the links below:
Environment Agency Riverine natural capital condition and ecosystem service mapping
Riverine Natural Capital Condition and Ecosystem Service Mapping Project: summary
Ecosystem Service Map Explorer (ESME): applications and limitations Chief Scientist’s Group report
ESME Use Cases